Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    flydubai lifts Thailand service to 35 weekly flights

    November 26, 2026

    Ebola outbreak in DR Congo tops 12,000 confirmed infections

    November 26, 2026

    Bahrain tourism tops 2026 goal with 15.2 million visitors

    November 26, 2026
    Facebook X (Twitter) Instagram
    • Home
    • Contact Us
    Tripura DailyTripura Daily
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Tripura DailyTripura Daily
    Home » 28GW TOPCon manufacturing capacity added in Astronergy
    PR Newswire

    28GW TOPCon manufacturing capacity added in Astronergy

    April 28, 2023

    HANGZHOU, China, April 28, 2023 /PRNewswire/ — Manufacturing bases of Astronergy saw 28GW n-type TOPCon manufacturing capacity grow on April 27, marking once more enhancement in the company’s n-type TOPCon production strength after loading 5GW TOPCon module manufacturing capacity in early April this year.

    The phase four project of Astronergy Manufacturing Base saw the move-in of 8GW n-type TOPCon cell equipment and 12GW TOPCon module equipment to one of its new cell workshops and two of its new module workshops on April 27. And at the same day, 8GW TOPCon cell equipment arrived at Astronergy Fengyang Manufacturing Base workshop and was ready to start the trial run.

    A photo captures a new TOPCon module equipment moved in a module workshop in Astronergy Haining Manufacturing Base.

    Loading new TOPCon manufacturing capacities in two manufacturing bases simultaneously, the absolute confidence and strength of Astronergy in its TOPCon tech and TOPCon modules are evident.

    The capacity leapfrog of TOPCon at Haining Manufacturing Base – Astronergy global headquarters and R&D center makes the base hitting production capacities of over 17GW PV cells and over 24GW PV modules.

    Said Haiyan Huang, EVP & CSO at Astronergy, the 8GW TOPCon cell equipment and 12GW TOPCon module equipment are expected to gradually run at full load 60 days later and Haining Base is to fulfil its target of doubling production capacity and production value before 2025.

    As a newly exposed and the sixth manufacturing base of Astronergy, Fengyang Manufacturing Base is in China’s Anhui province, focusing on TOPCon cell production. Soon after the equipment is in place, the manufacturing base will see the rollout of the first piece TOPCon cell in late May and is expected to run at full capacity in June.

    As the pioneer in n-type TOPCon PV modules, Astronergy is aiming to make the TOPCon modules one of its main products. Adding new TOPCon capacities in cells and modules is certainly a firm step forward to being the competitive supplier of PV modules worldwide.

    Photo – https://mma.prnewswire.com/media/2065455/A_n_type_TOPCon_PV_module_manufacturing_equipment_moved_a_workshop.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/28gw-topcon-manufacturing-capacity-added-in-astronergy-301810467.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email WhatsApp

    Related Posts

    Mobile Global Deepens Executive Team, Appoints Digital Media Veteran Dominick Miserandino as Chief Marketing Officer

    May 8, 2025

    Mobile Global Deepens Executive Team, Appoints Digital Media Veteran Dominick Miserandino as Chief Marketing Officer

    May 8, 2025

    Health and Fitness Manufacturers at the Forefront of Product Development at the 136th Canton Fair

    November 1, 2024

    Rosedale Global High School Students Receive $6 Million in Scholarships from Top 50 Global Universities

    October 25, 2024
    Latest News

    flydubai lifts Thailand service to 35 weekly flights

    November 26, 2026

    Ebola outbreak in DR Congo tops 12,000 confirmed infections

    November 26, 2026

    Bahrain tourism tops 2026 goal with 15.2 million visitors

    November 26, 2026

    Oil prices fall as Brent slips to $90.97 a barrel

    November 25, 2026

    Abdullah bin Zayed and Barbados’ Sinckler discuss closer ties

    November 24, 2026

    Petrobras plans $122 billion investment for 2027 to 2031

    November 24, 2026

    Sheikh Mohamed and Markwayne Mullin discuss UAE-US cooperation

    November 23, 2026

    Cambodia reports new mpox case after 30-month gap

    November 23, 2026
    © 2026 Tripura Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.